
Residents are invited to attend a drop-in public information session on March 31 from 6 to 8 pm at The Bridge Public House in the Rideau Room, at 1 Donald Street, to discuss the integrated watermain and sewer renewal project planned for de l’Église Street, from Montreal Road to McArthur Road, and Blake Street for 172 metres west from de l’Église Street. Preliminary design drawings will be on display and staff will be present to answer any questions and receive comments. There will not be a formal presentation at this open house. Please attend at your leisure. The information materials will be available at this link for review and comments after the open house. Feedback is welcome by April 14.
What: The project includes watermain and sewer replacements, along with full road reconstruction featuring new pavement, sidewalks, traffic-calming measures, and bicycle infrastructure.- de l’Église Street: Montreal Road to McArthur Avenue
- Blake Street: de l’Église Street to 172 metres west of de l’Église Street
More information is available at ottawa.ca/delEgliseStreet.


