Enbridge Gas will be replacing a valve and installing a 4-inch permanent bypass on Montreal Road and Center Street between Hillside Drive and Brittany Drive. The estimated start and end dates are July 1 to August 30.
Enbridge Gas will be replacing a valve and installing a 4-inch permanent bypass on Montreal Road and Center Street between Hillside Drive and Brittany Drive. The estimated start and end dates are July 1 to August 30.