To install services in front of 235 Mariposa Avenue, a contractor has applied to the City for permission to enact lane closure. The work will entail excavating across the roadway in front of this address. Excavation will start on the south side of Mariposa Avenue, resulting in a temporary closure of the eastbound lane. The work will then move to the north side of Mariposa Avenue, resulting in the temporary closure of the westbound lane. At all times, one lane will be open and traffic control personnel will be on site, along with construction signage to guide vehicles through safely. The work is scheduled to take place Feb. 3 to 7.