
The contractor working on the St. Patrick Street Bridge rehabilitation project will be doing work on the bridge overnight from Oct. 27 to Nov. 28 between 10 pm and 7 am. The work involves jacking the bridge, relocating concrete barriers, traffic control configuration set up which involves grinding and blasting the current traffic lines. The work will require use of a generator, wheeled excavator and a compressor. Project details: ottawa.ca


